Forensic Scheduler - Project Controls & Delay Analysis Job at X4 Engineering, Houston, TX

dzVIMXZhVG5lRVAzeTdmWGNaL3VjQkVxc1E9PQ==
  • X4 Engineering
  • Houston, TX

Job Description

Forensic Scheduler – Project Controls & Delay Analysis

Location: Hybrid (Texas)

Contract Type: Permanent

Salary: $80,000-$150,000 + Bonus

X4 Engineering is seeking a highly detail-oriented and analytical forensic scheduler to join my client's dynamic team! This role involves developing and maintaining baseline schedules, performing real-time schedule updates, conducting delay analysis, and contributing to claims resolution. The ideal candidate has a strong background in CPM scheduling, project controls, and forensic analysis, with a keen eye for identifying schedule risks and discrepancies.

Key Responsibilities:

  • Develop and refine baseline Critical Path Method (CPM) schedules, ensuring alignment with phasing plans.
  • Work directly with project teams to facilitate pull planning sessions, optimizing sequencing and execution strategies.
  • Perform regular schedule updates, integrating actual progress and analyzing changes to the longest and near-longest paths.
  • Evaluate forecast schedules, adjusting logic as necessary to maintain project efficiency and continuity.
  • Conduct QA/QC reviews to detect and correct out-of-sequence logic, ensuring scheduling accuracy.
  • Perform time impact analyses, tracking schedule deviations and assessing project delays.
  • Analyze findings and provide clients with forecast reports, risk assessments, and strategic solutions.
  • Examine and interpret project cost control documents, ensuring financial alignment with scheduling projections.
  • Conduct in-depth research and fact-finding to support claims investigations and dispute resolution.
  • Apply methodologies outlined in AACE for forensic delay analysis, ensuring industry compliance.

Qualifications & Skills:

  • 3–8 years of experience in construction scheduling, forensic analysis, and claims resolution .
  • Bachelor's degree in Civil Engineering or Construction Management preferred.
  • Strong analytical thinking, problem-solving skills, and written communication abilities.
  • Ability to work under pressure, meet tight deadlines , and manage multiple projects simultaneously.
  • Expertise in CPM scheduling , covering both proactive planning and forensic claims analysis .
  • Experience in various sectors, including multi-family, commercial, hospitality, and healthcare projects .
  • Proficiency in MS Project, Primavera P6, and Oracle Cloud scheduling tools.
  • Preferred certifications include PSP (Planning & Scheduling Professional) or equivalent .
  • Candidates based in Austin, Houston, San Antonio or Dallas are preferred, with flexibility for client site travel .

Benefits:

  • Competitive base salary with bonus.
  • Very flexible hybrid work structure.
  • Young, dynamic, no pressure environment.
  • Comprehensive healthcare coverage, including medical, dental, and vision.
  • 401(k) plan with company contributions.
  • Paid vacation and personal leave.
  • Huge focus on professional development and leadership training opportunities.
  • Access to industry-leading technology and resources for forensic scheduling and dispute resolution.

This is an opportunity to work on high-impact projects , apply advanced scheduling techniques , and play a key role in dispute resolution and claims analysis .

If you have a strong background in construction claims/scheduling, apply now or contact me to have a confidential chat!

+1 254-254-1625

m.shahbaz@x4engineering.com

Job Tags

Permanent employment, Contract work, Flexible hours,

Similar Jobs

Great Clips

Hair Stylist Job at Great Clips

 ...to be the best stylist in town? At a Great Clips salon, that can happen. Want to be a salon manager or trainer or a member of an artistic design team? Yep, at a Great Clips salon, you can make that happen, too. State-of-the-art training programs and ongoing trend training... 

PACCAR

Summer Internship - Operations Support Engineering Job at PACCAR

 ...Requisition Summary PACCAR Parts has an exciting Operations Support Engineering summer internship opening at ourPACCAR PartsDistribution Center in Renton, WA. The selected candidate will work directlyindustry professionals, gaining exposure and experience in multiple... 

Optum

Primary Care Nurse Practitioner or Physician Assistant - Optum Smokey Point, Marysville, WA Job at Optum

Optum Washington, (formerly The Everett Clinic) is seeking a Nurse Practitioner or Physician Assistant to join our team at the Smokey Point Clinic in Marysville, WA. Optum is a clinician-led care organization that is changing the way clinicians work and live. As a member...

Baylor College of Medicine

Registered Nurse II-Outpatient Clinic-Sugar Land Job at Baylor College of Medicine

 ...Sugar Land location is seeking a competent and reliable Registered Nurse II to join our multidisciplinary clinic, which includes Cardiology, Gastroenterology, and...  ...under the direction of our team of physicians. The RN II position is expected to demonstrate clinical competence... 

Links Recruiting, LLC

Delivery Driver Job at Links Recruiting, LLC

 ...We're seeking Delivery Drivers to join a growing furniture retailer as they expand into the Rochester, NY market. This is a high-impact role where you'll represent the company at the final step of the customer experience, ensuring safe, timely, and professional deliveries...